Break down a plan

Convert an approved strategy into outcome-based milestones that remain coherent, testable, and reviewable.

4 min readUpdated August 19, 2026

Working prompt

Break down the current approved plan into ordered implementation milestones without changing its strategy, scope, exclusions, contracts, or acceptance criteria. Do not modify files or begin implementation.

Build milestone boundaries around coherent outcomes, not file types or engineering layers. Each milestone must leave the repository internally valid for the scope reached and include the production behavior, public contracts, tests, documentation, migrations, compatibility work, verification, and cleanup required for that outcome.

For every milestone, provide: objective, dependencies, exact owned scope, implementation work, focused and regression checks, acceptance criteria, and a developer review checkpoint. Identify risks that must be resolved before the next milestone. Do not create temporary duplication, unused scaffolding, tests-later phases, or compatibility paths that the approved plan did not require.

End with the complete ordered sequence and ask for approval of the breakdown. Make clear that approving the breakdown does not authorize implementation and that each milestone requires separate authorization.

Situation

The strategy is approved, but the complete implementation would be too large to reason about, verify, or review safely in one pass.

A milestone is useful when it creates a meaningful checkpoint: a contract becomes usable, a migration safely expands the system, one end-to-end behavior is complete, or a risky integration is proven. It is not simply a smaller pile of files.

Common mistake

Mechanical breakdowns follow the folder tree:

  1. add types
  2. add database code
  3. add service code
  4. add UI
  5. add tests and documentation

This leaves deliberately broken states, separates behavior from its correctness evidence, and encourages approval based on activity rather than outcomes. It also creates pressure to keep temporary scaffolding because later milestones depend on it.

Agentic approach

Decompose around states that are worth reviewing independently. A strong milestone may cross several layers because contracts, behavior, tests, and documentation belong together.

Use these questions to find boundaries:

  • What is the smallest end-to-end capability that can be complete and verified?
  • Which work must land together to preserve compatibility or data integrity?
  • Where does developer judgment materially affect the next step?
  • Which risk should be resolved before the rest of the plan becomes cheap?
  • Can the repository stop after this milestone without carrying dead or misleading paths?

Before you send the prompt

Make sure the agent has the final approved plan, not an earlier draft. Include all developer amendments and explicitly identify compatibility, deployment, migration, and rollback requirements.

If the plan is not approved, return to planning. A breakdown should not become a back door for settling architecture.

Worked example

For the audit-log CSV export, a weak breakdown would create the endpoint, tests, and UI in separate milestones. The endpoint milestone would expose an unused contract; the UI milestone could not be verified until later tests arrived.

A coherent sequence could be:

Milestone 1: Prove the bounded export path

  • Add the server-owned export operation using the existing filter and authorization contracts.
  • Stream CSV with explicit safe columns and deterministic formatting.
  • Cover authorization, empty output, escaping, result bounds, cancellation, and persistence failures where applicable.
  • Document the export contract and operational limit.
  • Verify the owning package and production build.

Review checkpoint: Confirm that data exposure, memory behavior, and the synchronous size limit are safe before adding a public control.

Milestone 2: Expose export to administrators

  • Add the accessible UI action and loading, success, cancellation, and error states.
  • Preserve the existing paginated list state while forwarding its validated filters.
  • Add integration or browser coverage for permissions, keyboard use, narrow viewports, and both themes.
  • Synchronize user-facing documentation.

Review checkpoint: Confirm the complete user flow and decide whether measured demand justifies a future asynchronous export path.

Each milestone is useful on its own, carries its tests with it, and leaves the repository coherent. Neither creates a generic export framework or background job that the approved plan did not require.

What a good result contains

  • milestones ordered by real dependencies and risk
  • one finished outcome per milestone
  • exact owned files, symbols, contracts, configuration, migrations, and documentation when known
  • implementation and correctness evidence in the same milestone
  • acceptance criteria that can be observed rather than inferred
  • focused checks and the broader regression boundary
  • a developer review checkpoint with a real decision or risk to inspect
  • no redesign, scope growth, or automatically authorized later work

Useful follow-ups

If milestones look like file batches:

Rewrite each milestone as an observable completed capability. Move its tests, contracts, and documentation into the same milestone.

If a milestone is too large:

Identify the earliest point where one risk can be resolved and the repository can remain coherent. Split there without introducing temporary ownership or unused scaffolding.

If compatibility work is unclear:

Show which old and new components may coexist at each milestone. Keep only compatibility paths required by an actual deployment or persisted-data constraint.

Warning signs

  • one milestone per file, layer, or artifact type
  • tests, migrations, cleanup, or documentation deferred to a final phase
  • temporary duplicate paths introduced only to manufacture boundaries
  • a milestone that cannot pass its relevant verification
  • new architecture decisions hidden inside the breakdown
  • every milestone implicitly authorized by breakdown approval

Developer review responsibility

Confirm that each checkpoint is meaningful, that the sequence reflects real dependencies, and that stopping after any milestone leaves an honest repository state. Approve the sequence separately from authorizing a specific milestone.